Partnerships
Xinyuanyi (Tianjin) Semiconductor Equipment Co., Ltd. starts every partnership by asking what value we can create for the other side. Each track has its own negotiation page: value to you, an agenda you can work in a first meeting, why we can deliver, and a dated action list. Fees and tenors stay in the diligence pack, reached via the contact form and an NDA.
Verifiable progress
- Purchased: 278 × 8-GPU AMD Instinct MI308X chassis (2,224 cards); equipment value to be shown on tax documents; mid-term plan 5,000-card class.
- Pre-production acceptance on a single 8×MI308X node for a 1T-parameter INT4 MoE model: 3,210 samples across four accuracy benches all passed (official delta −0.8% to −1.5%, inside the 2% red line).
- Deployment adaptation and performance tests with MiniMax are complete; token supply is in the commercial-signing process; a formal contract has not been signed.
- Signed storage-acceleration result: throughput +29–40%, TTFT −26–32% (Qwen3-Coder-480B-FP8 long-context cold recovery vs local NVMe; reports R2/R3).
See the evidence library.
Licensed financial lessors
Sale-and-leaseback
You take legal title, not a claim. During the lease the GPU assets belong to the lessor; on default you repossess rather than litigate a mortgage. The assets are purchased and inspectable: 278 eight-GPU chassis / 2,224 cards; value on tax documents. Downstream payment is checkable: MiniMax is in the token-supply commercial-signing process; a formal contract has not been signed.
- Title sits with the lessor; repossession, not a mortgage fight.
- Asset, load and exit are all verifiable; the diligence pack follows a credit-committee outline.
- Repayment can be locked jointly via a co-signed offtake — a formal contract has not been signed.
SI / IDC procurement / public tenders / AIDC operators
In-stock chassis sale
You want countable, deliverable chassis — not another deck. We purchased 278 AMD Instinct MI308X eight-GPU servers. Single-node acceptance travels with the inquiry pack. Token talks are credit only: Zhipu, Kimi and MiniMax; MiniMax is in the signing process, and a formal contract has not been signed.
- Purchased inventory, not a slide-deck order.
- Single-node acceptance is checkable; value on tax documents.
- No list price here; the band follows an inquiry.
Banks, factors, SCF platforms
Supply-chain finance and factoring
What you want is a short-chain receivable you can confirm directly — not another trade intermediary. The payer type is a foundation-model company. We purchased 278 eight-GPU servers (2,224 cards); value on tax documents. MiniMax is in the token-supply commercial-signing process; a formal contract has not been signed. After that contract lands, we discuss factoring, LCs or a collection account on your instruments — we do not invent a receivable that does not yet exist.
- The payer is a foundation-model company; confirmation does not travel through a trade chain.
- Signing and confirmation first; factoring or LCs second. No unsigned contract is treated as an existing receivable.
- After the 278-chassis batch runs, later placements reuse the same process.
IDC, GPU cloud, bare-metal, OEMs
Long-term GPU chassis rental
You want idle racks, power and chassis turned into load that is working when the machines boot — not another tenant who only asks for a quote. We purchased 2,224 MI308X cards; incremental rental absorbs traffic, it does not fill a missing first cluster. We bring models, channels and our all-flash array. You keep title and lift idle-hour utilisation. Mid-range cards are in scope.
- We arrive with models and traffic; assets stop waiting for a customer.
- You keep title; our array keeps local-disk requirements modest.
- Deployment already runs on a purchased cluster; incremental rental is expansion, not a trial of us.
Strategy / IR / industrial capital / IT distribution
Listed-company and industrial collaboration
What you want is a position you can verify before you decide to make it your own P&L: a gated joint test of about ten weeks (G1–G4), no financing at that stage, stop-loss if a gate is missed. What passes can become contract and disclosure: downstream token-supply / offtake may be co-signed by you and Xinyuanyi as joint suppliers; a formal contract has not been signed. We offer no services tied to secondary-market performance, and make no such statements.
- Joint test first: about ten weeks, G1–G4, stop-loss, no cheque at that stage.
- The position can become disclosable operating substance, not only a financial stake.
- 2,224 cards purchased plus about 600 chassis in prospect (intent, not held) — a pipeline, not a one-shot.
Why we can deliver this
Five reasons this is not another deck. Figures carry a denominator or a report ID. Economic numbers are engineering-model estimates, delivered as runnable Python after NDA.
Purchased kit, countable
278 eight-GPU chassis / 2,224 cards on the books; value on tax documents. About 600 chassis are a prospect pipeline (intent, not held) and are not added into stock.
Acceleration is our line
FX arrays are in production; KV tiering is source-adapted by us, not a resale. Signed throughput +29–40%, TTFT −26–32% (R2/R3 vs local NVMe).
Pre-production acceptance is done
8×MI308X, 1T-parameter INT4 MoE, 3,210 samples across four benches, official delta inside the 2% red line.
Downstream progress is not overstated
Talks and joint tests with Zhipu, Kimi and MiniMax; MiniMax is in token-supply signing, and a formal contract has not been signed. Communication is not collection.
Verify first, stop-loss built in
Joint test first, decisions second: gate-based acceptance with built-in stop-loss. G1 Week 2 / G2 Week 4 / G3 Week 7 / G4 Week 10. Full model after NDA.
Cadence shared by all five tracks
Each track page names who does what in which week. The index only freezes the nodes that must not stay vague.
D0
You name role and track; we confirm an owning contact within one business day.
NDA + 48 hours
Diligence index and scripts — no unsigned contract described as rent or a receivable.
This week or next
A 30-minute structure / owning-team call.
~10 weeks
G1–G4 gated joint test, stop-loss if missed; you always quote under your own policy.
- D0: tell us your role and track via the contact form, or reply to an outreach email.
- 48 hours after NDA: diligence-pack index and reproducible model scripts.
- This week or next: a 30-minute call on structure and owning team only — no price on that call.
- Joint-test spine of about ten weeks: G1 Week 2 Delivery acceptance → G2 Week 4 Single-node baseline → G3 Week 7 Main joint-test gate → G4 Week 10 Stability & acceptance; stop-loss if a gate is missed.
- Start with a batch; first-tranche participants get priority on the mid-term expansion. You quote under your policy.
Contact Wang Limin · +86 13161818898 · Send an inquiry
This page is a public description of one-to-one B2B cooperation. It does not constitute an offer, an investment offer, or any return promise. Figures are the 2026-09-15 external baseline; economic numbers are engineering-model estimates, not signed purchase or sales prices.