IDC, GPU cloud, bare-metal, OEMs
Long-term GPU chassis rental
You want idle racks, power and chassis turned into load that is working when the machines boot — not another tenant who only asks for a quote. We purchased 2,224 MI308X cards; incremental rental absorbs traffic, it does not fill a missing first cluster. We bring models, channels and our all-flash array. You keep title and lift idle-hour utilisation. Mid-range cards are in scope.
Please quote available chassis, SKU, lead time and settlement (monthly chassis, GPU-hour, off-peak). Two hard conditions: 2U rack space for our array, and staff access for deployment.
Value to you
- For an IDC, GPU cloud or OEM, utilisation is the first sensitive variable. We are not shopping for a first cluster. We bring a deployment and acceptance flow that already ran on 278 purchased chassis / 2,224 cards, and we rent your spare windows for incremental traffic.
- We bring three things: deployable open-weight models, token-sales channels in progress, and our own FX array (signed throughput +29–40%, reports R2/R3). KV cache sits on our array, so your local disks can be modest.
- You keep title. Settlement can be monthly chassis, GPU-hour or off-peak. After a deal, downstream token-supply / offtake may be co-signed as joint suppliers, so you become a party to the customer contract, not only the landlord. This is a prospective condition; a formal contract has not been signed.
- About 600 chassis in the prospect pipeline (intent, not held) means load can be added after the purchased batch runs — the relationship is not a one-shot.
Agenda for a first formal meeting
- Available kit: chassis count, SKU (including mid-range), lead time, power and network.
- The two hard conditions: 2U for our array; staff access for deploy and watch.
- Settlement: monthly / GPU-hour / off-peak; when the clock starts; how idle time is treated.
- Operations: fault response, remote and on-site rights, data-residency or MLPS constraints.
- Whether offtake is co-signed as joint supply (a formal contract has not been signed), and priority on later racks.
What this means in a term sheet
- The purchased 278-chassis (2,224-card) deployment and acceptance flow already runs; incremental rental absorbs traffic growth, not a missing first cluster.
- KV cache sits on our all-flash array — local disks on your chassis can be modest. We need 2U for that array.
- Settlement is open: monthly chassis, GPU-hour, or off-peak pricing.
- We are in commercial talks and joint tests with Zhipu, Kimi and MiniMax; MiniMax is in the token-supply signing process, and a formal contract has not been signed.
Why we can deliver this
Five reasons this is not another deck. Figures carry a denominator or a report ID. Economic numbers are engineering-model estimates, delivered as runnable Python after NDA.
Purchased kit, countable
278 eight-GPU chassis / 2,224 cards on the books; value on tax documents. About 600 chassis are a prospect pipeline (intent, not held) and are not added into stock.
Acceleration is our line
FX arrays are in production; KV tiering is source-adapted by us, not a resale. Signed throughput +29–40%, TTFT −26–32% (R2/R3 vs local NVMe).
Pre-production acceptance is done
8×MI308X, 1T-parameter INT4 MoE, 3,210 samples across four benches, official delta inside the 2% red line.
Downstream progress is not overstated
Talks and joint tests with Zhipu, Kimi and MiniMax; MiniMax is in token-supply signing, and a formal contract has not been signed. Communication is not collection.
Verify first, stop-loss built in
Joint test first, decisions second: gate-based acceptance with built-in stop-loss. G1 Week 2 / G2 Week 4 / G3 Week 7 / G4 Week 10. Full model after NDA.
On this track specifically
- We already purchased 2,224 cards and need a long-term increment. This is not a price-check RFQ; the deploy path ran on our own batch.
- Acceleration is our product: arrays in production, modest local-disk need, 2U plus access.
- Channels are not empty: talks and joint tests with Zhipu, Kimi and MiniMax; MiniMax is in signing, and a formal contract has not been signed.
- The gated test already has weeks: G1–G4 at weeks 2 / 4 / 7 / 10; stop-loss if a gate is missed. You need not sign a year first.
- After NDA the acceptance scripts are reproducible, so utilisation is not a slogan.
Next actions and dates
D0 (today)
Reply with chassis, SKU, lead time, and whether the 2U and access conditions can be met.
48 hours after NDA
We send the bring-up list, array power/network needs, and the gate table.
Week 1
Align rack location, power, remote accounts; sign access and confidentiality.
Week 2 G1
Delivery acceptance: All materials delivered and inspected; each array passes power-on self-test with all 24 drives recognized.
Week 7 G3
Main joint-test gate: KV tiering acceleration: TTFT reduction ≥25% and throughput gain within the measured +29–40% band; 8 nodes sharing one array approach the NIC ceiling on read-back.
Week 10 G4
Stability & acceptance: 72-hour continuous stress with no interruption; single-drive / single-link fault injection transparent to the workload; signed joint-test report issued. Volume settlement only after the gate.
Verifiable progress
- Purchased: 278 × 8-GPU AMD Instinct MI308X chassis (2,224 cards); equipment value to be shown on tax documents; mid-term plan 5,000-card class.
- Pre-production acceptance on a single 8×MI308X node for a 1T-parameter INT4 MoE model: 3,210 samples across four accuracy benches all passed (official delta −0.8% to −1.5%, inside the 2% red line).
- Deployment adaptation and performance tests with MiniMax are complete; token supply is in the commercial-signing process; a formal contract has not been signed.
- Signed storage-acceleration result: throughput +29–40%, TTFT −26–32% (Qwen3-Coder-480B-FP8 long-context cold recovery vs local NVMe; reports R2/R3).
Contact Wang Limin · +86 13161818898 · mingxin@agentmail.to
Other counterparties
Licensed financial lessors
Sale-and-leaseback
Title sits with the lessor; repossession, not a mortgage fight.
SI / IDC procurement / public tenders / AIDC operators
In-stock chassis sale
Purchased inventory, not a slide-deck order.
Banks, factors, SCF platforms
Supply-chain finance and factoring
The payer is a foundation-model company; confirmation does not travel through a trade chain.
Strategy / IR / industrial capital / IT distribution
Listed-company and industrial collaboration
Joint test first: about ten weeks, G1–G4, stop-loss, no cheque at that stage.
This page is a public description of one-to-one B2B cooperation. It does not constitute an offer, an investment offer, or any return promise. Figures are the 2026-09-15 external baseline; economic numbers are engineering-model estimates, not signed purchase or sales prices.